Time and Cost Optimization in project excution
Abstract & Details
Research Area
Civil Engineering
Keywords
critical path method
crashing
cost optimization
cost.
Abstract
The main objective in the field of construction is to complete every project on time, within budget and quality full. The requirements of construction management are the useful utility, structural firmness, economy, speed, and quality of construction. In the every construction project time and cost trade-off are two important factors. It is crucial in achieving the project objectives. Dealing with different conflicting facets of the project is one of the challenging problems which often Construction Company has to face. Time loss is always costly and time-saving can provide profit to all the parties in the project. There is always a mutual affinity between time and cost. Time cost optimization is necessary and very important for a construction project. The objective of time cost optimization is to determine optimum project duration corresponding to the minimum total cost and this can be achieved with help of reducing the duration of critical activities in the network in order by breaking the activities of critical activities to minimize the overall project duration. In this study, critical path method (CPM) with an investigative method is used to find out the crash duration and crash cost and. An analysis is performed to identify the relationship between the time and cost in order to formalize an optimization problem model. In the analysis part, for this problem solving will be performed by manual methods. Then the reasons are introduced to increase the duration of project, then through project crashing technique optimisation of time and cost will be easy early completion of project applying this approach the obtained result is satisfactory, that is an indication of usefulness of this approach in construction project management problems, a numerical example in the paper shows the advantage of the proposed approach.
License
This work is licensed under a Creative
Commons
Attribution-ShareAlike 4.0 International License.
Author Information
| # | Name | Institute / Affiliation |
|---|---|---|
| 1 | Shamsul Haque Hamidullah | Al-FALAH UNIVERSITY |
How to Cite
Use the following formats to cite this article in your research.
APA Style
Hamidullah, Shamsul Haque (2017). Time and Cost Optimization in project excution. International Journal of Advance Research and Innovative Ideas In Education, 3(4), 2491-2497.
MLA Style
Hamidullah, Shamsul Haque. "Time and Cost Optimization in project excution." International Journal of Advance Research and Innovative Ideas In Education, vol. 3, no. 4, 2017, pp. 2491-2497.
IEEE Style
Shamsul Haque Hamidullah, "Time and Cost Optimization in project excution," International Journal of Advance Research and Innovative Ideas In Education, vol. 3, no. 4, pp. 2491-2497, 2017.
Vancouver Style
Hamidullah Shamsul Haque. Time and Cost Optimization in project excution. International Journal of Advance Research and Innovative Ideas In Education. 2017;3(4):2491-2497.
Harvard Style
Hamidullah, Shamsul Haque (2017) 'Time and Cost Optimization in project excution', International Journal of Advance Research and Innovative Ideas In Education, 3(4), pp. 2491-2497.
Chicago Style
Hamidullah, Shamsul Haque. "Time and Cost Optimization in project excution." International Journal of Advance Research and Innovative Ideas In Education 3, no. 4 (2017): 2491-2497.
Turabian Style
Hamidullah, Shamsul Haque. "Time and Cost Optimization in project excution." International Journal of Advance Research and Innovative Ideas In Education 3, no. 4 (2017): 2491-2497.
Related Research
ENERGY ANALYSIS OF RESIDENTIAL BUILDING USING REVIT
PDF Unavailable
Evaluation of Pavement Distress and Maintenance Strategies for National Highway NH-448 (Ajmer to Beawar Section), Rajasthan
PDF Unavailable
Wind-Induced Productivity Loss in Pre-Engineered Building Erection: A Regression-Based Analysis from a High-Wind Zone Ajmer, (India)
PDF Unavailable
CEMENT TREATMENT OF A SILTY-CLAYEY SOIL FOR ROAD FOUNDATION LAYER: CASE OF RN43 FARATSIHO–SAMBAINA, MADAGASCAR
PDF Unavailable
Applications Artificial Intelligence and Machine Learning in Civil Engineering Domain
PDF Unavailable
Estimation of Roof Top Rainwater Harvesting Potential for Ground Water Recharging Considering Dominant Losses.
PDF Unavailable
Circular Economy in Civil Engineering
PDF Unavailable
kicthen organic waste as a material for vermiculture and a source of nutrients for plants
PDF Unavailable
STUDY ON SEISMIC ANALYSIS OF EARTH DAMS AND EMBANKMENT
PDF Unavailable