APPLICATION OF FAST TRACKING TECHNIQUES TO OVERCOME TIME & COST OVERRUNS IN CONSTRUCTION
Abstract & Details
Research Area
Civil Engineering
Keywords
Project Management
Time overrun
Cost overrun
fast Tracking
etc
Abstract
Construction technology includes a nice potential to enhance productivity and reduce project period. Delay happens in several construction activities, delays will cause wide negative effects like loss of productivity and revenue, and contract termination. Additionally, the paper presents the connection between new technology and time overrun in those projects. In India the amount of road development activities is increasing from time to time. However, it becomes tough to finish the project within the allotted cost and time. Taking this into thought, time and price overrun is one among the most important issues in Indian road project. The foremost necessary causes for overrun were delayed to furnish and deliver the location, financial issues, and improper designing. Whereas the foremost necessary causes of cost overrun were found to be a delay in construction, inadequate provision of raw materials and Instruments by contractors, improper planning, incomplete design. Therefore, this analysis was administered to know such issues and to resolve such overrun of time and cost by implementing fast tracking techniques. Fast tracking is one of project management methodology. It has a very important use and purpose - to deliver on time, on budget activities even once one or additional limiting constraints substitute the method of success. Fast tracking could be a specialized management approach - to be used whenever you’re asked to deliver over existing capabilities enable and you would like a regular way to place things back in balance.
License
This work is licensed under a Creative
Commons
Attribution-ShareAlike 4.0 International License.
Author Information
| # | Name | Institute / Affiliation |
|---|---|---|
| 1 | Kiran B Chougala | Jain College of Egineering, Belagavi, Karnataka, India. |
| 2 | Amey Kelkar | Jain College of Egineering, Belagavi, Karnataka, India. |
How to Cite
Use the following formats to cite this article in your research.
APA Style
Chougala, Kiran B & Kelkar, Amey (2017). APPLICATION OF FAST TRACKING TECHNIQUES TO OVERCOME TIME & COST OVERRUNS IN CONSTRUCTION. International Journal of Advance Research and Innovative Ideas In Education, 3(4), 2045-2049.
MLA Style
Chougala, Kiran B, and Amey Kelkar. "APPLICATION OF FAST TRACKING TECHNIQUES TO OVERCOME TIME & COST OVERRUNS IN CONSTRUCTION." International Journal of Advance Research and Innovative Ideas In Education, vol. 3, no. 4, 2017, pp. 2045-2049.
IEEE Style
Kiran B Chougala and Amey Kelkar, "APPLICATION OF FAST TRACKING TECHNIQUES TO OVERCOME TIME & COST OVERRUNS IN CONSTRUCTION," International Journal of Advance Research and Innovative Ideas In Education, vol. 3, no. 4, pp. 2045-2049, 2017.
Vancouver Style
Chougala Kiran B, Kelkar Amey. APPLICATION OF FAST TRACKING TECHNIQUES TO OVERCOME TIME & COST OVERRUNS IN CONSTRUCTION. International Journal of Advance Research and Innovative Ideas In Education. 2017;3(4):2045-2049.
Harvard Style
Chougala, Kiran B & Kelkar, Amey (2017) 'APPLICATION OF FAST TRACKING TECHNIQUES TO OVERCOME TIME & COST OVERRUNS IN CONSTRUCTION', International Journal of Advance Research and Innovative Ideas In Education, 3(4), pp. 2045-2049.
Chicago Style
Chougala, Kiran B and Amey Kelkar. "APPLICATION OF FAST TRACKING TECHNIQUES TO OVERCOME TIME & COST OVERRUNS IN CONSTRUCTION." International Journal of Advance Research and Innovative Ideas In Education 3, no. 4 (2017): 2045-2049.
Turabian Style
Chougala, Kiran B and Amey Kelkar. "APPLICATION OF FAST TRACKING TECHNIQUES TO OVERCOME TIME & COST OVERRUNS IN CONSTRUCTION." International Journal of Advance Research and Innovative Ideas In Education 3, no. 4 (2017): 2045-2049.
Related Research
ENERGY ANALYSIS OF RESIDENTIAL BUILDING USING REVIT
PDF Unavailable
Evaluation of Pavement Distress and Maintenance Strategies for National Highway NH-448 (Ajmer to Beawar Section), Rajasthan
PDF Unavailable
Wind-Induced Productivity Loss in Pre-Engineered Building Erection: A Regression-Based Analysis from a High-Wind Zone Ajmer, (India)
PDF Unavailable
CEMENT TREATMENT OF A SILTY-CLAYEY SOIL FOR ROAD FOUNDATION LAYER: CASE OF RN43 FARATSIHO–SAMBAINA, MADAGASCAR
PDF Unavailable
Applications Artificial Intelligence and Machine Learning in Civil Engineering Domain
PDF Unavailable
Estimation of Roof Top Rainwater Harvesting Potential for Ground Water Recharging Considering Dominant Losses.
PDF Unavailable
Circular Economy in Civil Engineering
PDF Unavailable
kicthen organic waste as a material for vermiculture and a source of nutrients for plants
PDF Unavailable
STUDY ON SEISMIC ANALYSIS OF EARTH DAMS AND EMBANKMENT
PDF Unavailable