Reducing duration and cost of construction by shifting the activities in night time.

July 2017
Vol-3, Issue-4
Paper ID: 5866
ISSN: 2395-4396
Downloads: 0

Abstract & Details

Research Area
CIVIL engineering.
Keywords
Construction Duration Cost Quality Productivity Flyover.
Abstract
For this report the methodology adopted is first prepare the objectives and problem statement for the project. As stated in problem statement the main objective of project is decided as the effect of night time construction on total duration and total cost of project by considering quality and productivity of work then collect all the data in forms of journals, research papers, articles and prepare literature review with consideration research work. For this about 5 researches paper were collected and their summary report submitted in this report. Select the flyover site and collect all the data required for the project, analyze the data and find out activities which are suitable for night time construction, Also by analyzing the data find out the total change in duration and change in cost of project, Published a research paper in journal, Prepare the final report and presentation for dissertation work.

Author Information

# Name Institute / Affiliation
1 Miss. Kokate Sarika Rohidas Dr. D.Y.PATIL INSTI. OF ENGG.& TECH.AMBI
2 Prof. Salunkhe Hemant Dr. D.Y.PATIL INSTI. OF ENGG.& TECH.AMBI

How to Cite

Use the following formats to cite this article in your research.

APA Style
Rohidas, Miss. Kokate Sarika & Hemant, Prof. Salunkhe (2017). Reducing duration and cost of construction by shifting the activities in night time.. International Journal of Advance Research and Innovative Ideas In Education, 3(4), 614-618.
MLA Style
Rohidas, Miss. Kokate Sarika, and Prof. Salunkhe Hemant. "Reducing duration and cost of construction by shifting the activities in night time.." International Journal of Advance Research and Innovative Ideas In Education, vol. 3, no. 4, 2017, pp. 614-618.
IEEE Style
Miss. Kokate Sarika Rohidas and Prof. Salunkhe Hemant, "Reducing duration and cost of construction by shifting the activities in night time.," International Journal of Advance Research and Innovative Ideas In Education, vol. 3, no. 4, pp. 614-618, 2017.
Vancouver Style
Rohidas Miss. Kokate Sarika, Hemant Prof. Salunkhe. Reducing duration and cost of construction by shifting the activities in night time.. International Journal of Advance Research and Innovative Ideas In Education. 2017;3(4):614-618.
Harvard Style
Rohidas, Miss. Kokate Sarika & Hemant, Prof. Salunkhe (2017) 'Reducing duration and cost of construction by shifting the activities in night time.', International Journal of Advance Research and Innovative Ideas In Education, 3(4), pp. 614-618.
Chicago Style
Rohidas, Miss. Kokate Sarika and Prof. Salunkhe Hemant. "Reducing duration and cost of construction by shifting the activities in night time.." International Journal of Advance Research and Innovative Ideas In Education 3, no. 4 (2017): 614-618.
Turabian Style
Rohidas, Miss. Kokate Sarika and Prof. Salunkhe Hemant. "Reducing duration and cost of construction by shifting the activities in night time.." International Journal of Advance Research and Innovative Ideas In Education 3, no. 4 (2017): 614-618.

Export Citation

Related Research

ENERGY ANALYSIS OF RESIDENTIAL BUILDING USING REVIT
Deepti et al. 2026 Civil Engineering
PDF Unavailable
Applications Artificial Intelligence and Machine Learning in Civil Engineering Domain
Abdus Salam Bakhtiyar Ahmed Dafedar et al. 2026 Civil Engineering
PDF Unavailable
Circular Economy in Civil Engineering
SHITALKUMAR S.DESHMUKH et al. 2026 CIVIL ENGINEERING
PDF Unavailable
kicthen organic waste as a material for vermiculture and a source of nutrients for plants
SANTOSH TAMMANNA BASARAGI et al. 2026 Civil Engineering
PDF Unavailable
STUDY ON SEISMIC ANALYSIS OF EARTH DAMS AND EMBANKMENT
Mr. Rahul Paikrao et al. 2025 Civil Engineering
PDF Unavailable