CONSTRUCTION AND DEMOLITION WASTE RECYCLING SYSTEM: A STUDY

April 2017
Vol-3, Issue-2
Paper ID: 4788
ISSN: 2395-4396
Downloads: 0

Abstract & Details

Research Area
CIVIL ENGINEERING
Keywords
C&D Waste Phase Construction Materials etc.
Abstract
In this paper stakeholders are asked to give further insights in the barriers towards high quality recycling of C&D waste materials. We elaborated on the three distinctive phases of the lifecycle of buildings, i.e. pre-building phase, building phase and post-building phase. The pre-building phase includes raw material production and building material production (prefab material). When the building materials are available, the building is constructed. Once the building is completed, it can be inhabited. Even though users have a minor impact on the waste generated, they are included within the stakeholders because the use phase of the building is a vital part of the life cycle of the materials. The demolition phase follows after the use phase of the building has ended. The waste material recovered during the demolition – or construction - phase is sorted. The customer, the petitioner of the demolition, is the starting point of the waste recycling system. The client has an influence on the decision-making related to waste treatment. For instance, the time available for demolition is a result of the choices made by the petitioner. Studying the relationships between actors operating in the system, an insight regarding the possible barriers that hamper the recycling of C&D waste can be revealed.

Author Information

# Name Institute / Affiliation
1 Sanjay Pathak BHAGWANT UNIVERSITY
2 Lokesh Kumar BHAGWANT UNIVERSITY
3 Ujala Mishra BHAGWANT UNIVERSITY
4 Amit Choudhary BHAGWANT UNIVERSITY

How to Cite

Use the following formats to cite this article in your research.

APA Style
Pathak, Sanjay, Kumar, Lokesh, Mishra, Ujala, & Choudhary, Amit (2017). CONSTRUCTION AND DEMOLITION WASTE RECYCLING SYSTEM: A STUDY. International Journal of Advance Research and Innovative Ideas In Education, 3(2), 4334-4338.
MLA Style
Pathak, Sanjay, et al. "CONSTRUCTION AND DEMOLITION WASTE RECYCLING SYSTEM: A STUDY." International Journal of Advance Research and Innovative Ideas In Education, vol. 3, no. 2, 2017, pp. 4334-4338.
IEEE Style
Sanjay Pathak, Lokesh Kumar, Ujala Mishra, and Amit Choudhary, "CONSTRUCTION AND DEMOLITION WASTE RECYCLING SYSTEM: A STUDY," International Journal of Advance Research and Innovative Ideas In Education, vol. 3, no. 2, pp. 4334-4338, 2017.
Vancouver Style
Pathak Sanjay, Kumar Lokesh, Mishra Ujala, Choudhary Amit. CONSTRUCTION AND DEMOLITION WASTE RECYCLING SYSTEM: A STUDY. International Journal of Advance Research and Innovative Ideas In Education. 2017;3(2):4334-4338.
Harvard Style
Pathak, Sanjay, Kumar, Lokesh, Mishra, Ujala, & Choudhary, Amit (2017) 'CONSTRUCTION AND DEMOLITION WASTE RECYCLING SYSTEM: A STUDY', International Journal of Advance Research and Innovative Ideas In Education, 3(2), pp. 4334-4338.
Chicago Style
Pathak, Sanjay, et al. "CONSTRUCTION AND DEMOLITION WASTE RECYCLING SYSTEM: A STUDY." International Journal of Advance Research and Innovative Ideas In Education 3, no. 2 (2017): 4334-4338.
Turabian Style
Pathak, Sanjay, et al. "CONSTRUCTION AND DEMOLITION WASTE RECYCLING SYSTEM: A STUDY." International Journal of Advance Research and Innovative Ideas In Education 3, no. 2 (2017): 4334-4338.

Export Citation

Related Research

ENERGY ANALYSIS OF RESIDENTIAL BUILDING USING REVIT
Deepti et al. 2026 Civil Engineering
PDF Unavailable
Applications Artificial Intelligence and Machine Learning in Civil Engineering Domain
Abdus Salam Bakhtiyar Ahmed Dafedar et al. 2026 Civil Engineering
PDF Unavailable
Circular Economy in Civil Engineering
SHITALKUMAR S.DESHMUKH et al. 2026 CIVIL ENGINEERING
PDF Unavailable
kicthen organic waste as a material for vermiculture and a source of nutrients for plants
SANTOSH TAMMANNA BASARAGI et al. 2026 Civil Engineering
PDF Unavailable
STUDY ON SEISMIC ANALYSIS OF EARTH DAMS AND EMBANKMENT
Mr. Rahul Paikrao et al. 2025 Civil Engineering
PDF Unavailable