TARGET COST CONTRACT& GUARANTEED MAXIMUM PRICE CONTRACT: AN INNOVATIVE APPAROCH FOR CONSTRUCTION VENTURES
Abstract & Details
Research Area
Civil Engineering
Keywords
Construction contracts
contract management
guaranteed maximum price contract
Target Cost contract
contract variation
Risk allocation
Abstract
Contracting is a basic piece of construction ventures. Dealing with the agreements in this way is similarly vital for the accomplishment of any business procedure because of quick increment in numerous contracts. The customary strategy for overseeing contract includes dangers and confusion which incorporate insufficient data in contracts, lacking appointment of power and obligation,
Misrepresentation, robbery, defilement, other deceptive exercises, correspondence hole, deferred budgetary choices accordingly hosing the advance of the venture, all because of manual intercession in overseeing contracts. This requires a need of orderly and a viable technique for contract administration. This paper talks about Target Cost contract TC contract & guaranteed maximum price or GMP contract, which is a proficient, straightforward and faultless idea of overseeing contracts. This procedure will streamline the business procedure by lessening the time taken to make, audit, execute and support contracts, along these lines facilitating exercises like following, focal stockpiling of contract archives, and decrease in debate, minimize dangers connected with manual information passage
License
This work is licensed under a Creative
Commons
Attribution-ShareAlike 4.0 International License.
Author Information
| # | Name | Institute / Affiliation |
|---|---|---|
| 1 | PRASHANT KUMAR GANGWAR | Department of Civil Engineering University Institute of Engineering & Technology, Babasahab Bhimrao Ambedkar University, Lucknow, U.P, INDIA-226025 |
| 2 | Satya Prakash Pandey | Department of Civil Engineering University Institute of Engineering & Technology, Babasahab Bhimrao Ambedkar University, Lucknow, U.P, INDIA-226025 |
How to Cite
Use the following formats to cite this article in your research.
APA Style
GANGWAR, PRASHANT KUMAR & Pandey, Satya Prakash (2016). TARGET COST CONTRACT& GUARANTEED MAXIMUM PRICE CONTRACT: AN INNOVATIVE APPAROCH FOR CONSTRUCTION VENTURES. International Journal of Advance Research and Innovative Ideas In Education, 2(5), 1056-1063.
MLA Style
GANGWAR, PRASHANT KUMAR, and Satya Prakash Pandey. "TARGET COST CONTRACT& GUARANTEED MAXIMUM PRICE CONTRACT: AN INNOVATIVE APPAROCH FOR CONSTRUCTION VENTURES." International Journal of Advance Research and Innovative Ideas In Education, vol. 2, no. 5, 2016, pp. 1056-1063.
IEEE Style
PRASHANT KUMAR GANGWAR and Satya Prakash Pandey, "TARGET COST CONTRACT& GUARANTEED MAXIMUM PRICE CONTRACT: AN INNOVATIVE APPAROCH FOR CONSTRUCTION VENTURES," International Journal of Advance Research and Innovative Ideas In Education, vol. 2, no. 5, pp. 1056-1063, 2016.
Vancouver Style
GANGWAR PRASHANT KUMAR, Pandey Satya Prakash. TARGET COST CONTRACT& GUARANTEED MAXIMUM PRICE CONTRACT: AN INNOVATIVE APPAROCH FOR CONSTRUCTION VENTURES. International Journal of Advance Research and Innovative Ideas In Education. 2016;2(5):1056-1063.
Harvard Style
GANGWAR, PRASHANT KUMAR & Pandey, Satya Prakash (2016) 'TARGET COST CONTRACT& GUARANTEED MAXIMUM PRICE CONTRACT: AN INNOVATIVE APPAROCH FOR CONSTRUCTION VENTURES', International Journal of Advance Research and Innovative Ideas In Education, 2(5), pp. 1056-1063.
Chicago Style
GANGWAR, PRASHANT KUMAR and Satya Prakash Pandey. "TARGET COST CONTRACT& GUARANTEED MAXIMUM PRICE CONTRACT: AN INNOVATIVE APPAROCH FOR CONSTRUCTION VENTURES." International Journal of Advance Research and Innovative Ideas In Education 2, no. 5 (2016): 1056-1063.
Turabian Style
GANGWAR, PRASHANT KUMAR and Satya Prakash Pandey. "TARGET COST CONTRACT& GUARANTEED MAXIMUM PRICE CONTRACT: AN INNOVATIVE APPAROCH FOR CONSTRUCTION VENTURES." International Journal of Advance Research and Innovative Ideas In Education 2, no. 5 (2016): 1056-1063.
Related Research
ENERGY ANALYSIS OF RESIDENTIAL BUILDING USING REVIT
PDF Unavailable
Evaluation of Pavement Distress and Maintenance Strategies for National Highway NH-448 (Ajmer to Beawar Section), Rajasthan
PDF Unavailable
Wind-Induced Productivity Loss in Pre-Engineered Building Erection: A Regression-Based Analysis from a High-Wind Zone Ajmer, (India)
PDF Unavailable
CEMENT TREATMENT OF A SILTY-CLAYEY SOIL FOR ROAD FOUNDATION LAYER: CASE OF RN43 FARATSIHO–SAMBAINA, MADAGASCAR
PDF Unavailable
Applications Artificial Intelligence and Machine Learning in Civil Engineering Domain
PDF Unavailable
Estimation of Roof Top Rainwater Harvesting Potential for Ground Water Recharging Considering Dominant Losses.
PDF Unavailable
Circular Economy in Civil Engineering
PDF Unavailable
kicthen organic waste as a material for vermiculture and a source of nutrients for plants
PDF Unavailable
STUDY ON SEISMIC ANALYSIS OF EARTH DAMS AND EMBANKMENT
PDF Unavailable