The Implementation of Earned Value Management (EVM) in Cost and Time Control of a Road Improvement Project
Abstract & Details
Research Area
Civil Engineering
Keywords
Project Performance
Earned Value Management (EVM)
Cost & Time Management of Construction Projects
Abstract
The construction of road infrastructure in Indonesia continues to progress as a form of the Government’s responsibility in providing safe and comfortable mobility facilities for the public. The increasing intensity of construction projects, particularly road development, is often faced with various challenges, one of which is project delays. These delays can cause significant losses to both contractors and project owners, thereby highlighting the need for effective project management to address such issues. One method that can be used for cost and time control in projects is the Earned Value Management (EVM) method. Earned Value Management is an integrated approach to controlling project cost and schedule by estimating the cost of the work that has been completed. This method can be used to assess the current condition of a project based on performance elements at the time of monitoring. This study was conducted by examining a road improvement project in Mukomuko Regency, Bengkulu Province. The results showed that the project performance condition could be classified as “Very Good,” as indicated by the analysis of SV (Schedule Variance), SPI (Schedule Performance Index), CV (Cost Variance), and CPI (Cost Performance Index), where none of the values were negative or below zero (<0). This indicates that the project activities were carried out faster than scheduled, the work met expectations or was on time, and even exceeded planned targets during certain weeks. The estimated cost to complete the project is predicted to be IDR 25,***,***,***. The project is expected to be completed on time within 25 weeks. It is also predicted to yield a profit of IDR 37,***,*** or approximately ± 0.14%. Although this is not a significant profit margin, the project can still be considered successful and not financially detrimental.
License
This work is licensed under a Creative
Commons
Attribution-ShareAlike 4.0 International License.
Author Information
| # | Name | Institute / Affiliation |
|---|---|---|
| 1 | Ir. Rezi Munizar, S.T., M.T. | Ratu Samban University |
| 2 | Ir. Benny Dwika Leonanda, M.T., IPM., ASEAN Eng. | Andalas University |
How to Cite
Use the following formats to cite this article in your research.
APA Style
M.T., Ir. Rezi Munizar, S.T., & Eng., Ir. Benny Dwika Leonanda, M.T., IPM., ASEAN (2025). The Implementation of Earned Value Management (EVM) in Cost and Time Control of a Road Improvement Project. International Journal of Advance Research and Innovative Ideas In Education, 11(4), 166-171.
MLA Style
M.T., Ir. Rezi Munizar, S.T.,, and Ir. Benny Dwika Leonanda, M.T., IPM., ASEAN Eng.. "The Implementation of Earned Value Management (EVM) in Cost and Time Control of a Road Improvement Project." International Journal of Advance Research and Innovative Ideas In Education, vol. 11, no. 4, 2025, pp. 166-171.
IEEE Style
Ir. Rezi Munizar, S.T., M.T. and Ir. Benny Dwika Leonanda, M.T., IPM., ASEAN Eng., "The Implementation of Earned Value Management (EVM) in Cost and Time Control of a Road Improvement Project," International Journal of Advance Research and Innovative Ideas In Education, vol. 11, no. 4, pp. 166-171, 2025.
Vancouver Style
M.T. Ir. Rezi Munizar, S.T.,, Eng. Ir. Benny Dwika Leonanda, M.T., IPM., ASEAN. The Implementation of Earned Value Management (EVM) in Cost and Time Control of a Road Improvement Project. International Journal of Advance Research and Innovative Ideas In Education. 2025;11(4):166-171.
Harvard Style
M.T., Ir. Rezi Munizar, S.T., & Eng., Ir. Benny Dwika Leonanda, M.T., IPM., ASEAN (2025) 'The Implementation of Earned Value Management (EVM) in Cost and Time Control of a Road Improvement Project', International Journal of Advance Research and Innovative Ideas In Education, 11(4), pp. 166-171.
Chicago Style
M.T., Ir. Rezi Munizar, S.T., and Ir. Benny Dwika Leonanda, M.T., IPM., ASEAN Eng.. "The Implementation of Earned Value Management (EVM) in Cost and Time Control of a Road Improvement Project." International Journal of Advance Research and Innovative Ideas In Education 11, no. 4 (2025): 166-171.
Turabian Style
M.T., Ir. Rezi Munizar, S.T., and Ir. Benny Dwika Leonanda, M.T., IPM., ASEAN Eng.. "The Implementation of Earned Value Management (EVM) in Cost and Time Control of a Road Improvement Project." International Journal of Advance Research and Innovative Ideas In Education 11, no. 4 (2025): 166-171.
Related Research
ENERGY ANALYSIS OF RESIDENTIAL BUILDING USING REVIT
PDF Unavailable
Evaluation of Pavement Distress and Maintenance Strategies for National Highway NH-448 (Ajmer to Beawar Section), Rajasthan
PDF Unavailable
Wind-Induced Productivity Loss in Pre-Engineered Building Erection: A Regression-Based Analysis from a High-Wind Zone Ajmer, (India)
PDF Unavailable
CEMENT TREATMENT OF A SILTY-CLAYEY SOIL FOR ROAD FOUNDATION LAYER: CASE OF RN43 FARATSIHO–SAMBAINA, MADAGASCAR
PDF Unavailable
Applications Artificial Intelligence and Machine Learning in Civil Engineering Domain
PDF Unavailable
Estimation of Roof Top Rainwater Harvesting Potential for Ground Water Recharging Considering Dominant Losses.
PDF Unavailable
Circular Economy in Civil Engineering
PDF Unavailable
kicthen organic waste as a material for vermiculture and a source of nutrients for plants
PDF Unavailable
STUDY ON SEISMIC ANALYSIS OF EARTH DAMS AND EMBANKMENT
PDF Unavailable