PLANNING & SCHEDULING OF RESIDENTIAL BUILDING B+G+15 WITH MICROSOFT PROJECTS

June 2024
Vol-10, Issue-3
Paper ID: 24251
ISSN: 2395-4396
Downloads: 0

Abstract & Details

Research Area
Civil Engineering
Keywords
-
Abstract
This study delves into the intricacies of planning and scheduling a residential building project comprising a basement, ground floor, and 15 upper floors (B+G+15) using Microsoft Project. The objective is to establish an effective project management framework that ensures timely completion, optimal resource allocation, and cost control. Utilizing Microsoft Project, a comprehensive scheduling model is developed, encompassing all phases from site preparation to final handover. Key project management principles such as Work Breakdown Structure (WBS), Critical Path Method (CPM), and Gantt charts are employed to streamline activities and identify potential bottlenecks. The study highlights the importance of integrating detailed planning with dynamic scheduling to adapt to unforeseen changes, manage risks, and maintain project momentum. Through meticulous task sequencing, resource leveling, and continuous monitoring, the project demonstrates improved efficiency and reduced delays. The findings underscore the efficacy of Microsoft Project as a robust tool for managing complex construction projects, ultimately contributing to enhanced project performance and stakeholder satisfaction.

Author Information

# Name Institute / Affiliation
1 Akhilesh Singh Maharishi University of Information Technology, Lucknow
2 Dr. Gaurav Shukla Maharishi University of Information Technology, Lucknow

How to Cite

Use the following formats to cite this article in your research.

APA Style
Singh, Akhilesh & Shukla, Dr. Gaurav (2024). PLANNING & SCHEDULING OF RESIDENTIAL BUILDING B+G+15 WITH MICROSOFT PROJECTS. International Journal of Advance Research and Innovative Ideas In Education, 10(3), 4883-4890.
MLA Style
Singh, Akhilesh, and Dr. Gaurav Shukla. "PLANNING & SCHEDULING OF RESIDENTIAL BUILDING B+G+15 WITH MICROSOFT PROJECTS." International Journal of Advance Research and Innovative Ideas In Education, vol. 10, no. 3, 2024, pp. 4883-4890.
IEEE Style
Akhilesh Singh and Dr. Gaurav Shukla, "PLANNING & SCHEDULING OF RESIDENTIAL BUILDING B+G+15 WITH MICROSOFT PROJECTS," International Journal of Advance Research and Innovative Ideas In Education, vol. 10, no. 3, pp. 4883-4890, 2024.
Vancouver Style
Singh Akhilesh, Shukla Dr. Gaurav. PLANNING & SCHEDULING OF RESIDENTIAL BUILDING B+G+15 WITH MICROSOFT PROJECTS. International Journal of Advance Research and Innovative Ideas In Education. 2024;10(3):4883-4890.
Harvard Style
Singh, Akhilesh & Shukla, Dr. Gaurav (2024) 'PLANNING & SCHEDULING OF RESIDENTIAL BUILDING B+G+15 WITH MICROSOFT PROJECTS', International Journal of Advance Research and Innovative Ideas In Education, 10(3), pp. 4883-4890.
Chicago Style
Singh, Akhilesh and Dr. Gaurav Shukla. "PLANNING & SCHEDULING OF RESIDENTIAL BUILDING B+G+15 WITH MICROSOFT PROJECTS." International Journal of Advance Research and Innovative Ideas In Education 10, no. 3 (2024): 4883-4890.
Turabian Style
Singh, Akhilesh and Dr. Gaurav Shukla. "PLANNING & SCHEDULING OF RESIDENTIAL BUILDING B+G+15 WITH MICROSOFT PROJECTS." International Journal of Advance Research and Innovative Ideas In Education 10, no. 3 (2024): 4883-4890.

Export Citation

Related Research

ENERGY ANALYSIS OF RESIDENTIAL BUILDING USING REVIT
Deepti et al. 2026 Civil Engineering
PDF Unavailable
Applications Artificial Intelligence and Machine Learning in Civil Engineering Domain
Abdus Salam Bakhtiyar Ahmed Dafedar et al. 2026 Civil Engineering
PDF Unavailable
Circular Economy in Civil Engineering
SHITALKUMAR S.DESHMUKH et al. 2026 CIVIL ENGINEERING
PDF Unavailable
kicthen organic waste as a material for vermiculture and a source of nutrients for plants
SANTOSH TAMMANNA BASARAGI et al. 2026 Civil Engineering
PDF Unavailable
STUDY ON SEISMIC ANALYSIS OF EARTH DAMS AND EMBANKMENT
Mr. Rahul Paikrao et al. 2025 Civil Engineering
PDF Unavailable