ANALYSIS OF DELAY IN CONSTRUCTION PROJECT IN INDIA

August 2022
Vol-8, Issue-4
Paper ID: 18002
ISSN: 2395-4396
Downloads: 0

Abstract & Details

Research Area
CIVIL ENGINEERING
Keywords
Causes of delay Construction Project Construction Industry
Abstract
The building industry in India is an important sector because of its tremendous contribution to the country's economic development. However, due to the country's geographical, political, social, and financial status, many building projects are prone to delays. These delay causes can only be prevented by first recognizing the issues and their sources. The primary goal of this research was to identify the major reasons of construction project delays in India. The study design was quantitative, with data collected from clients, consultants, and contractors via questionnaires. The questionnaire, created with Google form technology, included a list of delay-causing elements that respondents were asked to score on a 5-point Likert scale. The collected data were analyzed with the Statistical Program for Social Scientists (SPSS). According to the findings, the top primary reasons of delay were material shortages, erroneous time calculation, and building faults. Furthermore, the top major consequences of delay were cost overruns, time overruns, bad social consequences, and lawsuits. Furthermore, the top major hazards connected with construction delays were: excessive pressure on project stakeholders, disagreements among project participants, project abandonment, total cost rise, and income reduction.

Author Information

# Name Institute / Affiliation
1 ADITYA JOSEPH St. Joseph's College of Engineering and Technology
2 Dr. K J George St. Joseph's College of Engineering and Technology

How to Cite

Use the following formats to cite this article in your research.

APA Style
JOSEPH, ADITYA & George, Dr. K J (2022). ANALYSIS OF DELAY IN CONSTRUCTION PROJECT IN INDIA. International Journal of Advance Research and Innovative Ideas In Education, 8(4), 1986-1994.
MLA Style
JOSEPH, ADITYA, and Dr. K J George. "ANALYSIS OF DELAY IN CONSTRUCTION PROJECT IN INDIA." International Journal of Advance Research and Innovative Ideas In Education, vol. 8, no. 4, 2022, pp. 1986-1994.
IEEE Style
ADITYA JOSEPH and Dr. K J George, "ANALYSIS OF DELAY IN CONSTRUCTION PROJECT IN INDIA," International Journal of Advance Research and Innovative Ideas In Education, vol. 8, no. 4, pp. 1986-1994, 2022.
Vancouver Style
JOSEPH ADITYA, George Dr. K J. ANALYSIS OF DELAY IN CONSTRUCTION PROJECT IN INDIA. International Journal of Advance Research and Innovative Ideas In Education. 2022;8(4):1986-1994.
Harvard Style
JOSEPH, ADITYA & George, Dr. K J (2022) 'ANALYSIS OF DELAY IN CONSTRUCTION PROJECT IN INDIA', International Journal of Advance Research and Innovative Ideas In Education, 8(4), pp. 1986-1994.
Chicago Style
JOSEPH, ADITYA and Dr. K J George. "ANALYSIS OF DELAY IN CONSTRUCTION PROJECT IN INDIA." International Journal of Advance Research and Innovative Ideas In Education 8, no. 4 (2022): 1986-1994.
Turabian Style
JOSEPH, ADITYA and Dr. K J George. "ANALYSIS OF DELAY IN CONSTRUCTION PROJECT IN INDIA." International Journal of Advance Research and Innovative Ideas In Education 8, no. 4 (2022): 1986-1994.

Export Citation

Related Research

ENERGY ANALYSIS OF RESIDENTIAL BUILDING USING REVIT
Deepti et al. 2026 Civil Engineering
PDF Unavailable
Applications Artificial Intelligence and Machine Learning in Civil Engineering Domain
Abdus Salam Bakhtiyar Ahmed Dafedar et al. 2026 Civil Engineering
PDF Unavailable
Circular Economy in Civil Engineering
SHITALKUMAR S.DESHMUKH et al. 2026 CIVIL ENGINEERING
PDF Unavailable
kicthen organic waste as a material for vermiculture and a source of nutrients for plants
SANTOSH TAMMANNA BASARAGI et al. 2026 Civil Engineering
PDF Unavailable
STUDY ON SEISMIC ANALYSIS OF EARTH DAMS AND EMBANKMENT
Mr. Rahul Paikrao et al. 2025 Civil Engineering
PDF Unavailable