IDENTIFICATION OF CAUSES OF TIME AND COST OVERRUN, IT’S IMPACT AND CONTROL IN METRO PROJECTS IN INDIA
Abstract & Details
Research Area
Civil Engineering
Keywords
Delay
metro
cost
time
budget
management
planning
quality
and schedule are all terms that can be used to describe a situation.
Abstract
Metro rail systems are required in cities not only to offer an efficient public transportation system, but also to reduce traffic and improve environmental conditions. Many cities already have metro rail plans in the works, but implementation is hampered by a number of issues. The goal of this study paper is to examine the primary causes of schedule and expense delays, as well as to collect data from a diverse group of construction experts working on Metro Projects using a questionnaire survey. The main conclusions drawn from the data should benefit the construction industry in better assessing not only the major causes of delays as well as the causes of delays in overall construction projects, but also how to reduce them through appropriate planning and the use of splitting working methods.
Almost every metro project in India is running behind schedule. In megaprojects, delays are often regarded as the most common, challenging, and dangerous issue. The bulk of construction projects in underdeveloped countries have time overruns. All projects, regardless of their size or complexity, are plagued by deadlines and unpredictability. Every construction project encounters delays, which vary widely from one project to the next. Prior studies on time and cost overrun factors are thoroughly evaluated in this study. Aside from fulfilling the growing demand, sound decision-making throughout the construction phase can help to avoid delays. More research is needed, however. This might involve, among other things, research into decision-making procedures, the content of construction site management training programmes, the value of apprenticeship programmes in building a more skilled workforce, and the potential for expanded use of pre-cast materials. This study looked into the reasons for construction project delays in India.
License
This work is licensed under a Creative
Commons
Attribution-ShareAlike 4.0 International License.
Author Information
| # | Name | Institute / Affiliation |
|---|---|---|
| 1 | Sonar Ketan Prabhakar | JSPM's Rajarshi Shahu College of Engineering, Tathawade, Pune - 411033 |
| 2 | Roshan Pramod More | JSPM's Rajarshi Shahu College of Engineering, Tathawade, Pune - 411033 |
| 3 | Rutuja Balasaheb Shinde | JSPM's Rajarshi Shahu College of Engineering, Tathawade, Pune - 411033 |
| 4 | Prof. Raj Bhosale | JSPM's Rajarshi Shahu College of Engineering, Tathawade, Pune - 411033 |
How to Cite
Use the following formats to cite this article in your research.
APA Style
Prabhakar, Sonar Ketan, More, Roshan Pramod, Shinde, Rutuja Balasaheb, & Bhosale, Prof. Raj (2022). IDENTIFICATION OF CAUSES OF TIME AND COST OVERRUN, IT’S IMPACT AND CONTROL IN METRO PROJECTS IN INDIA. International Journal of Advance Research and Innovative Ideas In Education, 8(3), 1703-1713.
MLA Style
Prabhakar, Sonar Ketan, et al. "IDENTIFICATION OF CAUSES OF TIME AND COST OVERRUN, IT’S IMPACT AND CONTROL IN METRO PROJECTS IN INDIA." International Journal of Advance Research and Innovative Ideas In Education, vol. 8, no. 3, 2022, pp. 1703-1713.
IEEE Style
Sonar Ketan Prabhakar, Roshan Pramod More, Rutuja Balasaheb Shinde, and Prof. Raj Bhosale, "IDENTIFICATION OF CAUSES OF TIME AND COST OVERRUN, IT’S IMPACT AND CONTROL IN METRO PROJECTS IN INDIA," International Journal of Advance Research and Innovative Ideas In Education, vol. 8, no. 3, pp. 1703-1713, 2022.
Vancouver Style
Prabhakar Sonar Ketan, More Roshan Pramod, Shinde Rutuja Balasaheb, Bhosale Prof. Raj. IDENTIFICATION OF CAUSES OF TIME AND COST OVERRUN, IT’S IMPACT AND CONTROL IN METRO PROJECTS IN INDIA. International Journal of Advance Research and Innovative Ideas In Education. 2022;8(3):1703-1713.
Harvard Style
Prabhakar, Sonar Ketan, More, Roshan Pramod, Shinde, Rutuja Balasaheb, & Bhosale, Prof. Raj (2022) 'IDENTIFICATION OF CAUSES OF TIME AND COST OVERRUN, IT’S IMPACT AND CONTROL IN METRO PROJECTS IN INDIA', International Journal of Advance Research and Innovative Ideas In Education, 8(3), pp. 1703-1713.
Chicago Style
Prabhakar, Sonar Ketan, et al. "IDENTIFICATION OF CAUSES OF TIME AND COST OVERRUN, IT’S IMPACT AND CONTROL IN METRO PROJECTS IN INDIA." International Journal of Advance Research and Innovative Ideas In Education 8, no. 3 (2022): 1703-1713.
Turabian Style
Prabhakar, Sonar Ketan, et al. "IDENTIFICATION OF CAUSES OF TIME AND COST OVERRUN, IT’S IMPACT AND CONTROL IN METRO PROJECTS IN INDIA." International Journal of Advance Research and Innovative Ideas In Education 8, no. 3 (2022): 1703-1713.
Related Research
ENERGY ANALYSIS OF RESIDENTIAL BUILDING USING REVIT
PDF Unavailable
Evaluation of Pavement Distress and Maintenance Strategies for National Highway NH-448 (Ajmer to Beawar Section), Rajasthan
PDF Unavailable
Wind-Induced Productivity Loss in Pre-Engineered Building Erection: A Regression-Based Analysis from a High-Wind Zone Ajmer, (India)
PDF Unavailable
CEMENT TREATMENT OF A SILTY-CLAYEY SOIL FOR ROAD FOUNDATION LAYER: CASE OF RN43 FARATSIHO–SAMBAINA, MADAGASCAR
PDF Unavailable
Applications Artificial Intelligence and Machine Learning in Civil Engineering Domain
PDF Unavailable
Estimation of Roof Top Rainwater Harvesting Potential for Ground Water Recharging Considering Dominant Losses.
PDF Unavailable
Circular Economy in Civil Engineering
PDF Unavailable
kicthen organic waste as a material for vermiculture and a source of nutrients for plants
PDF Unavailable
STUDY ON SEISMIC ANALYSIS OF EARTH DAMS AND EMBANKMENT
PDF Unavailable