STUDY ON THE CAUSES OF DELAY IN A CONSTRUCTION PROJECT AND RECOMMENDATION

July 2019
Vol-5, Issue-4
Paper ID: 10614
ISSN: 2395-4396
Downloads: 0

Abstract & Details

Research Area
CIVIL ENGINEERING
Keywords
Construction delay delay mitigation risks consultants clients and contractors
Abstract
The main aim of this paper was to find out the main causes of delay in construction projects in India. The research design was quantitative, where the data was collected from clients, consultants and contractors using questionnaires. The questionnaire had a list of delay causing factors of which the respondents were ask to rank each according to the 5 point likert scale. The data obtained were analyzed using the Statistical Program for Social Scientists (SPSS). The results obtained indicate that the top major causes of delay were; fluctuation of prices of construction materials, shortage of materials, inaccurate time estimation, and errors during construction. In addition the top major effects of delay were; Cost overrun, acceleration of losses, time overrun, negative social impacts and litigation. Also the top major risks associated with construction delay were; too much pressure on project stake holders, price inflation of materials and overall project, disputes amongst project participants, project abandonment, overall cost increase and decline in revenue.

Author Information

# Name Institute / Affiliation
1 AHMAD MONIS ANSARI AL-FALAH UNIVERSITY

How to Cite

Use the following formats to cite this article in your research.

APA Style
ANSARI, AHMAD MONIS (2019). STUDY ON THE CAUSES OF DELAY IN A CONSTRUCTION PROJECT AND RECOMMENDATION. International Journal of Advance Research and Innovative Ideas In Education, 5(4), 298-315.
MLA Style
ANSARI, AHMAD MONIS. "STUDY ON THE CAUSES OF DELAY IN A CONSTRUCTION PROJECT AND RECOMMENDATION." International Journal of Advance Research and Innovative Ideas In Education, vol. 5, no. 4, 2019, pp. 298-315.
IEEE Style
AHMAD MONIS ANSARI, "STUDY ON THE CAUSES OF DELAY IN A CONSTRUCTION PROJECT AND RECOMMENDATION," International Journal of Advance Research and Innovative Ideas In Education, vol. 5, no. 4, pp. 298-315, 2019.
Vancouver Style
ANSARI AHMAD MONIS. STUDY ON THE CAUSES OF DELAY IN A CONSTRUCTION PROJECT AND RECOMMENDATION. International Journal of Advance Research and Innovative Ideas In Education. 2019;5(4):298-315.
Harvard Style
ANSARI, AHMAD MONIS (2019) 'STUDY ON THE CAUSES OF DELAY IN A CONSTRUCTION PROJECT AND RECOMMENDATION', International Journal of Advance Research and Innovative Ideas In Education, 5(4), pp. 298-315.
Chicago Style
ANSARI, AHMAD MONIS. "STUDY ON THE CAUSES OF DELAY IN A CONSTRUCTION PROJECT AND RECOMMENDATION." International Journal of Advance Research and Innovative Ideas In Education 5, no. 4 (2019): 298-315.
Turabian Style
ANSARI, AHMAD MONIS. "STUDY ON THE CAUSES OF DELAY IN A CONSTRUCTION PROJECT AND RECOMMENDATION." International Journal of Advance Research and Innovative Ideas In Education 5, no. 4 (2019): 298-315.

Export Citation

Related Research

ENERGY ANALYSIS OF RESIDENTIAL BUILDING USING REVIT
Deepti et al. 2026 Civil Engineering
PDF Unavailable
Applications Artificial Intelligence and Machine Learning in Civil Engineering Domain
Abdus Salam Bakhtiyar Ahmed Dafedar et al. 2026 Civil Engineering
PDF Unavailable
Circular Economy in Civil Engineering
SHITALKUMAR S.DESHMUKH et al. 2026 CIVIL ENGINEERING
PDF Unavailable
kicthen organic waste as a material for vermiculture and a source of nutrients for plants
SANTOSH TAMMANNA BASARAGI et al. 2026 Civil Engineering
PDF Unavailable
STUDY ON SEISMIC ANALYSIS OF EARTH DAMS AND EMBANKMENT
Mr. Rahul Paikrao et al. 2025 Civil Engineering
PDF Unavailable