CONSTRUCTIOIN PLANNING AND CONTROL USING PRIMAVERA P6
Abstract & Details
Research Area
Civil Engineering
Keywords
Planning
Scheduling
Resource allocation
Activity ID
Abstract
Monitoring and controlling a project is very important which is done through a complete process of collecting, recording and reporting project performance. For any construction projects around the world, time and cost plays a very important factor in completion of any project. As per report the project within the construction industry exceeds up to 30% due to irresponsible planning and execution. Due to lack of detail project sometime leads to cost overrun, time mismanagement and poor productivity. In this project we are going to plan and schedule a G+2 office building using a very conventional project scheduling software Primavera P6. Primavera provides a very comfortable space to manage project programs activities and resources with the help of its enterprise project portfolio management solution. In this project several activities and task where performed during the planning phase, duration where allotted, baseline where mentioned, activity detail, activity start and finish. Primavera helps in timely completion of the project and reduction in costs. So it is mostly uses in large construction industry. A detailed sequence of tasks are performed in order to examine the consequences of collected data in terms of scope and duration of the project. In this current project Primavera helps in planning, monitoring, scheduling, resources allocation and time management. Primavera is one the best software use in construction planning due to its better quality management process and easy results
License
This work is licensed under a Creative
Commons
Attribution-ShareAlike 4.0 International License.
Author Information
| # | Name | Institute / Affiliation |
|---|---|---|
| 1 | MD ZISHAN MALLICK | AL FALAH UNIVERSITY |
| 2 | MOHD ZEESHAN KHAN | AL FALAH UNIVERSITY |
How to Cite
Use the following formats to cite this article in your research.
APA Style
MALLICK, MD ZISHAN & KHAN, MOHD ZEESHAN (2019). CONSTRUCTIOIN PLANNING AND CONTROL USING PRIMAVERA P6. International Journal of Advance Research and Innovative Ideas In Education, 5(4), 170-175.
MLA Style
MALLICK, MD ZISHAN, and MOHD ZEESHAN KHAN. "CONSTRUCTIOIN PLANNING AND CONTROL USING PRIMAVERA P6." International Journal of Advance Research and Innovative Ideas In Education, vol. 5, no. 4, 2019, pp. 170-175.
IEEE Style
MD ZISHAN MALLICK and MOHD ZEESHAN KHAN, "CONSTRUCTIOIN PLANNING AND CONTROL USING PRIMAVERA P6," International Journal of Advance Research and Innovative Ideas In Education, vol. 5, no. 4, pp. 170-175, 2019.
Vancouver Style
MALLICK MD ZISHAN, KHAN MOHD ZEESHAN. CONSTRUCTIOIN PLANNING AND CONTROL USING PRIMAVERA P6. International Journal of Advance Research and Innovative Ideas In Education. 2019;5(4):170-175.
Harvard Style
MALLICK, MD ZISHAN & KHAN, MOHD ZEESHAN (2019) 'CONSTRUCTIOIN PLANNING AND CONTROL USING PRIMAVERA P6', International Journal of Advance Research and Innovative Ideas In Education, 5(4), pp. 170-175.
Chicago Style
MALLICK, MD ZISHAN and MOHD ZEESHAN KHAN. "CONSTRUCTIOIN PLANNING AND CONTROL USING PRIMAVERA P6." International Journal of Advance Research and Innovative Ideas In Education 5, no. 4 (2019): 170-175.
Turabian Style
MALLICK, MD ZISHAN and MOHD ZEESHAN KHAN. "CONSTRUCTIOIN PLANNING AND CONTROL USING PRIMAVERA P6." International Journal of Advance Research and Innovative Ideas In Education 5, no. 4 (2019): 170-175.
Related Research
ENERGY ANALYSIS OF RESIDENTIAL BUILDING USING REVIT
PDF Unavailable
Evaluation of Pavement Distress and Maintenance Strategies for National Highway NH-448 (Ajmer to Beawar Section), Rajasthan
PDF Unavailable
Wind-Induced Productivity Loss in Pre-Engineered Building Erection: A Regression-Based Analysis from a High-Wind Zone Ajmer, (India)
PDF Unavailable
CEMENT TREATMENT OF A SILTY-CLAYEY SOIL FOR ROAD FOUNDATION LAYER: CASE OF RN43 FARATSIHO–SAMBAINA, MADAGASCAR
PDF Unavailable
Applications Artificial Intelligence and Machine Learning in Civil Engineering Domain
PDF Unavailable
Estimation of Roof Top Rainwater Harvesting Potential for Ground Water Recharging Considering Dominant Losses.
PDF Unavailable
Circular Economy in Civil Engineering
PDF Unavailable
kicthen organic waste as a material for vermiculture and a source of nutrients for plants
PDF Unavailable
STUDY ON SEISMIC ANALYSIS OF EARTH DAMS AND EMBANKMENT
PDF Unavailable