PLANNING STUDY OF A HYDROELECTRIC POWER PLANT IN LOWER MANDRARE: CASE OF AMBOETSY
Abstract & Details
Research Area
Géosciences
Keywords
Mandrare
Deep Southern
Amboetsy
Madagascar.
Abstract
The Deep Southern of Madagascar possesses potential natural resources that could be beneficial to the local population. This area is highly rich and has various potentials, making it a zone of excellence for the future. However, the relevance of the vulnerability of the population's livelihood is strongly felt. It is an undeniable strategy that needs to be thoroughly studied for a sound local development project. Nevertheless, the fundamental constraint for socio-economic development in this area is the insufficient water resources. Given the interdependence of various production factors, implementing a single development project does not solve the problems. Therefore, it is essential to establish and implement a multi-component project, including provisions for drinking water supply, agriculture, livestock, hydroelectric power production, etc. Thus, the key factor for the development of the South lies in mastering water resources, regardless of the proposed options. This article focuses on studying an inter-hill type dam at sites with multiple development possibilities, including drinking water supply, irrigation, and hydroelectricity. The development of the Amboetsy hydroelectric power plant in the lower Mandrare was undertaken to harness the hydroelectric energy of the Mandrare River. The construction involved creating a reservoir, a power plant, and related infrastructure. The objective was to provide electricity to the surrounding regions, especially urban areas and industrial installations. However, this has led to environmental and social impacts, such as reduced river flow and population displacement.
License
This work is licensed under a Creative
Commons
Attribution-ShareAlike 4.0 International License.
Author Information
| # | Name | Institute / Affiliation |
|---|---|---|
| 1 | RAMANANTSOAVINA Romuald | Geography with a Specialization in Geosciences from the faculty of Sciences at the University of Toliara, Madagascar |
| 2 | RAHARIVELO Clin Ralantoarison | Faculty of Physics at the University of Toliara, Madagascar |
| 3 | RAVOLOLONIAINA Annie Zoé | Faculty of Arts and Humanities at the University of Toliara, Madagascar |
| 4 | SOLOMANA Edmond | Faculty of Sciences at the University of Toliara, Madagascar |
How to Cite
Use the following formats to cite this article in your research.
APA Style
Romuald, RAMANANTSOAVINA, Ralantoarison, RAHARIVELO Clin, Zoé, RAVOLOLONIAINA Annie, & Edmond, SOLOMANA (2024). PLANNING STUDY OF A HYDROELECTRIC POWER PLANT IN LOWER MANDRARE: CASE OF AMBOETSY. International Journal of Advance Research and Innovative Ideas In Education, 10(2), 279-287.
MLA Style
Romuald, RAMANANTSOAVINA, et al. "PLANNING STUDY OF A HYDROELECTRIC POWER PLANT IN LOWER MANDRARE: CASE OF AMBOETSY." International Journal of Advance Research and Innovative Ideas In Education, vol. 10, no. 2, 2024, pp. 279-287.
IEEE Style
RAMANANTSOAVINA Romuald, RAHARIVELO Clin Ralantoarison, RAVOLOLONIAINA Annie Zoé, and SOLOMANA Edmond, "PLANNING STUDY OF A HYDROELECTRIC POWER PLANT IN LOWER MANDRARE: CASE OF AMBOETSY," International Journal of Advance Research and Innovative Ideas In Education, vol. 10, no. 2, pp. 279-287, 2024.
Vancouver Style
Romuald RAMANANTSOAVINA, Ralantoarison RAHARIVELO Clin, Zoé RAVOLOLONIAINA Annie, Edmond SOLOMANA. PLANNING STUDY OF A HYDROELECTRIC POWER PLANT IN LOWER MANDRARE: CASE OF AMBOETSY. International Journal of Advance Research and Innovative Ideas In Education. 2024;10(2):279-287.
Harvard Style
Romuald, RAMANANTSOAVINA, Ralantoarison, RAHARIVELO Clin, Zoé, RAVOLOLONIAINA Annie, & Edmond, SOLOMANA (2024) 'PLANNING STUDY OF A HYDROELECTRIC POWER PLANT IN LOWER MANDRARE: CASE OF AMBOETSY', International Journal of Advance Research and Innovative Ideas In Education, 10(2), pp. 279-287.
Chicago Style
Romuald, RAMANANTSOAVINA, et al. "PLANNING STUDY OF A HYDROELECTRIC POWER PLANT IN LOWER MANDRARE: CASE OF AMBOETSY." International Journal of Advance Research and Innovative Ideas In Education 10, no. 2 (2024): 279-287.
Turabian Style
Romuald, RAMANANTSOAVINA, et al. "PLANNING STUDY OF A HYDROELECTRIC POWER PLANT IN LOWER MANDRARE: CASE OF AMBOETSY." International Journal of Advance Research and Innovative Ideas In Education 10, no. 2 (2024): 279-287.
Related Research
“Evaluating Government Schemes and School Dropout Patterns: A Case Study from Jagadishpur Gram Panchayat, West Bengal.”
PDF Unavailable
EFFECT OF CORROSION ON UNDERGROUND WATER IN SOME SELECTED AREA OF JEMA’A LOCAL GOVERNMENT AREA OF KADUNA STATE.
PDF Unavailable
STUDY OF THE CHEMICAL ELEMENTS COMPOSING THE COLORING ROLLS OF AMBONDROMIEHY SAPPHIRE: ANIVORANO COMMON IN THE DIANA REGION (MADAGASCAR)
PDF Unavailable
PETROGRAPHIC AND MINERALOGIC CHARACTERIZATION OF THE BETSIAKA GROUP, NORTHERN MADAGASCAR
PDF Unavailable
APPLICATION OF CARBON CAPTURE, UTILIZATION, AND STORAGE (CCUS) FOR CLEANER ENERGY- A REVIEW
PDF Unavailable