DEVELOP A STANDARD START-UP PROCEDURE OF STEAM TURBINE IN A POWER PLANT
Abstract & Details
Research Area
Science and technology
Keywords
Thermal power plant
loading
steam turbine
high pressure (HP
intermediate pressure (IP)
low pressure (LP)
turbine start-up
operating parameters. etc..
Abstract
Start-up procedure of a turbine depends on its casing and rotor temperature, pressure of steam etc. There are a variety of factors contributing to the improvement of the quality and security of this process. Therefore, in this study an analysis on of a specific case in a thermal power plant in Vietnam has been done.
License
This work is licensed under a Creative
Commons
Attribution-ShareAlike 4.0 International License.
Author Information
| # | Name | Institute / Affiliation |
|---|---|---|
| 1 | HS Bui | Université de Technologies de Ha Noi, 100000, Ha Noi, Viet Nam |
| 2 | TH Bui | Université de Technologies de Ha Noi, 100000, Ha Noi, Viet Nam |
How to Cite
Use the following formats to cite this article in your research.
APA Style
Bui, HS & Bui, TH (2023). DEVELOP A STANDARD START-UP PROCEDURE OF STEAM TURBINE IN A POWER PLANT. International Journal of Advance Research and Innovative Ideas In Education, 9(3), 5068-5075.
MLA Style
Bui, HS, and TH Bui. "DEVELOP A STANDARD START-UP PROCEDURE OF STEAM TURBINE IN A POWER PLANT." International Journal of Advance Research and Innovative Ideas In Education, vol. 9, no. 3, 2023, pp. 5068-5075.
IEEE Style
HS Bui and TH Bui, "DEVELOP A STANDARD START-UP PROCEDURE OF STEAM TURBINE IN A POWER PLANT," International Journal of Advance Research and Innovative Ideas In Education, vol. 9, no. 3, pp. 5068-5075, 2023.
Vancouver Style
Bui HS, Bui TH. DEVELOP A STANDARD START-UP PROCEDURE OF STEAM TURBINE IN A POWER PLANT. International Journal of Advance Research and Innovative Ideas In Education. 2023;9(3):5068-5075.
Harvard Style
Bui, HS & Bui, TH (2023) 'DEVELOP A STANDARD START-UP PROCEDURE OF STEAM TURBINE IN A POWER PLANT', International Journal of Advance Research and Innovative Ideas In Education, 9(3), pp. 5068-5075.
Chicago Style
Bui, HS and TH Bui. "DEVELOP A STANDARD START-UP PROCEDURE OF STEAM TURBINE IN A POWER PLANT." International Journal of Advance Research and Innovative Ideas In Education 9, no. 3 (2023): 5068-5075.
Turabian Style
Bui, HS and TH Bui. "DEVELOP A STANDARD START-UP PROCEDURE OF STEAM TURBINE IN A POWER PLANT." International Journal of Advance Research and Innovative Ideas In Education 9, no. 3 (2023): 5068-5075.
Related Research
Recent advances of polymers in pharmaceutical area
PDF Unavailable
THERMALLY CONDUCTIVE AND ELECTRICAL INSULATION OF EVA SHEET
PDF Unavailable